Festive Engineering
- Jon Buxton
- Jan 8, 2022
- 1 min read
Our engineers worked through the Christmas break to deliver a bespoke extract fan array for an office building in Hemel Hempstead. Designed and installed by Synaptics Energy Solutions, the fan array will provide a maximum 20 m3/s of extraction from the occupied space, replacing fans installed in 1989, before our Commissioning Manager was born! #fanwall #ecfan #extract
Comments